To carry out a technical assessment to establish the amount of Earthwork done to enable the IPA to have a basis of paying the contractor for the amount of work he has done as per the design documents.
Output/Services
- Review of all the design documents.
- Execute a topographical Survey
- Using the survey data compute the following volumes in cubic meters; the reservoir, silt trap, spillway, and embankment.
- Write a technical report and present to the client